Clough provided project management and engineering for a replacement pump and pipe work within the existing Talinga Gas Treatment Facility, as part of the Australian Pacific LNG (APLNG) project. The Gas Field is located in the Talinga Development, approximately 50 km from Dalby in Queensland.

The five concepts studied in the SELECT phase included the brownfield integration of a new pump and pipe work upgrade associated with the twelve existing compressors. A cost and schedule estimate, along with the project execution plans, was also developed. Work was executed by a team in Clough’s Brisbane Engineering office.

APLNG is a coal seam gas (CSG) to liquefied natural gas (LNG) project joint venture partnership between Origin, ConocoPhillips and Sinopec.

Talinga Expansion Project
Talinga Expansion ProjectLearn More

Talinga Expansion Project

Learn More

Origin Energy

Chinchilla, Queensland, Australia

Clough provided project management and engineering for a replacement pump and pipe work within the existing Talinga Gas Treatment Facility, as part of the Australian Pacific LNG (APLNG) project. The Gas Field is located in the Talinga Development, approximately 50 km from Dalby in Queensland.

The five concepts studied in the SELECT phase included the brownfield integration of a new pump and pipe work upgrade associated with the twelve existing compressors. A cost and schedule estimate, along with the project execution plans, was also developed. Work was executed by a team in Clough’s Brisbane Engineering office.

APLNG is a coal seam gas (CSG) to liquefied natural gas (LNG) project joint venture partnership between Origin, ConocoPhillips and Sinopec.