Sunrise Energy

Saldanha, South Africa

CMR Marine

The facility uses a floating multi-buoy morring system (MBM) where vessels of size 300GT – 20000GT may be received. A flexible hose connects the offloading vessel to a subsea PLEM (Pipeline End Manifold) which via an undersea pipeline of approximately 3.2 kilometres and an overland pipeline of approximately 2.1 kilometres, transports the LPG to the bullets at the storage terminal.

The near shore marine construction of the facility took 14 months to complete. Clough Murray & Roberts’ scope was completed very sucessfully, delivering the project on budget and on time. Utilising world leading engineering, construction management and project managmeent tools and resources the project was delivered to specification and is considered of world world class quality standard.

Through the implementation of our propriety Major Accident Prevention (MAP) HSE system, we were able to fulfil our goal of Zero Harm with no lost time injuries (LTIs) over duration of the project.

Saldahna Bay LPG Import Terminal
Saldahna Bay LPG Import Term...Learn More

Saldahna Bay LPG Import Terminal

Learn More

Sunrise Energy

Saldanha, South Africa

CMR Marine

The facility uses a floating multi-buoy morring system (MBM) where vessels of size 300GT – 20000GT may be received. A flexible hose connects the offloading vessel to a subsea PLEM (Pipeline End Manifold) which via an undersea pipeline of approximately 3.2 kilometres and an overland pipeline of approximately 2.1 kilometres, transports the LPG to the bullets at the storage terminal.

The near shore marine construction of the facility took 14 months to complete. Clough Murray & Roberts’ scope was completed very sucessfully, delivering the project on budget and on time. Utilising world leading engineering, construction management and project managmeent tools and resources the project was delivered to specification and is considered of world world class quality standard.

Through the implementation of our propriety Major Accident Prevention (MAP) HSE system, we were able to fulfil our goal of Zero Harm with no lost time injuries (LTIs) over duration of the project.