Chiyoda JGC Joint Venture (CJJV) awarded the contract to design and construct the LNG and condensate offloading jetty for the PNG LNG project to the BAM Clough Joint Venture. The LNG and condensate jetty was constructed adjacent to the planned LNG facility twenty kilometres northwest of Port Moresby on the coast of the Gulf of Papua.

The scope included the design and construction of a 2.4 kilometre long trestle with substation platform, loading platform and single LNG loadout berth.

PNG LNG Project Marine Jetty
PNG LNG Project Marine JettyLearn More

PNG LNG Project Marine Jetty

Learn More

Chiyoda JGC JV

Papua New Guinea, Papua New Guinea

BAM Clough

Chiyoda JGC Joint Venture (CJJV) awarded the contract to design and construct the LNG and condensate offloading jetty for the PNG LNG project to the BAM Clough Joint Venture. The LNG and condensate jetty was constructed adjacent to the planned LNG facility twenty kilometres northwest of Port Moresby on the coast of the Gulf of Papua.

The scope included the design and construction of a 2.4 kilometre long trestle with substation platform, loading platform and single LNG loadout berth.