Water Corporation of WA

Mundaring​, Western Australia, Australia

Clough scope includes EPC contract for the upgrade and refurbishment of the existing intake tower and outlet structures, that includes replacement of aging infrastructure and updating of the intake and outlet works to meet future climatic requirements.

​Lower minimum operating level in the reservoir by 6.6m.

Reduce dead storage capacity from 16.7GL to 6.2GL.

Reduce the surface area of the weir, to reduce annual evaporation by 1.5GL/year. (Volume of 600 Olympic Swimming Pools)

Extend the asset life of dam pipework and structures.​​​

Mundaring Weir Outlet Works Upgrade
Mundaring Weir Outlet Works ...Learn More

Mundaring Weir Outlet Works Upgrade

Learn More

Water Corporation of WA

Mundaring​, Western Australia, Australia

Clough scope includes EPC contract for the upgrade and refurbishment of the existing intake tower and outlet structures, that includes replacement of aging infrastructure and updating of the intake and outlet works to meet future climatic requirements.

​Lower minimum operating level in the reservoir by 6.6m.

Reduce dead storage capacity from 16.7GL to 6.2GL.

Reduce the surface area of the weir, to reduce annual evaporation by 1.5GL/year. (Volume of 600 Olympic Swimming Pools)

Extend the asset life of dam pipework and structures.​​​