JKC Australia LNG (JGC Corporation, KBR and Chiyoda Corporation JV)

Darwin, Northern Territory, Australia

BAM Clough Joint Venture was awarded the contract to design and construct the Ichthys LNG Project Product Loading Jetty located at Blaydin Point, Darwin, Northern Territory. Gas from the Ichthys Field will be transported from the offshore CPF through a subsea pipeline more than 885 kilometres to the onshore LNG processing plant located at Blaydin Point.

The Product Loading Jetty Work includes typical piled with crossheads trestle with concrete superstructure, loading platform for LNG and LPG / condensate, the provision of seawater intake including pump casing and slope protection, waste water outfall structures, navigation aids, marine operations, corrosion and cathodic protection systems.

Ichthys LNG Product Loading Jetty
Ichthys LNG Product Loading ...Learn More

Ichthys LNG Product Loading Jetty

Learn More

JKC Australia LNG (JGC Corporation, KBR and Chiyoda Corporation JV)

Darwin, Northern Territory, Australia

BAM Clough Joint Venture was awarded the contract to design and construct the Ichthys LNG Project Product Loading Jetty located at Blaydin Point, Darwin, Northern Territory. Gas from the Ichthys Field will be transported from the offshore CPF through a subsea pipeline more than 885 kilometres to the onshore LNG processing plant located at Blaydin Point.

The Product Loading Jetty Work includes typical piled with crossheads trestle with concrete superstructure, loading platform for LNG and LPG / condensate, the provision of seawater intake including pump casing and slope protection, waste water outfall structures, navigation aids, marine operations, corrosion and cathodic protection systems.