Northern Territory Government & Paspaley Group

Darwin, Northern Territory, Australia

BAM Clough

The BAM Clough joint venture’s scope includes technical support and constructability input during Front-End Engineering Design works for the Ship Lift and Marine Industries Project in Darwin, Northern Territory.​

The Ship Lift and Marine Industries project represents an AU$100 million investment by the Northern Territory Government into major projects that will boost the local economy. The proposed project will include a ship lift facility for lifting vessels from the water for dry docking and maintenance works, and a common user area, being a hardstand area, available for ship repair and maintenance works.

The project will have the capacity to lift vessels more than 90 meters in length, including the Australian Defence Forces’ new offshore patrol vessel fleet.​

Sunrise Energy

Saldanha, South Africa

CMR Marine

The facility uses a floating multi-buoy morring system (MBM) where vessels of size 300GT – 20000GT may be received. A flexible hose connects the offloading vessel to a subsea PLEM (Pipeline End Manifold) which via an undersea pipeline of approximately 3.2 kilometres and an overland pipeline of approximately 2.1 kilometres, transports the LPG to the bullets at the storage terminal.

The near shore marine construction of the facility took 14 months to complete. Clough Murray & Roberts’ scope was completed very sucessfully, delivering the project on budget and on time. Utilising world leading engineering, construction management and project managmeent tools and resources the project was delivered to specification and is considered of world world class quality standard.

Through the implementation of our propriety Major Accident Prevention (MAP) HSE system, we were able to fulfil our goal of Zero Harm with no lost time injuries (LTIs) over duration of the project.

Clough engineers, constructs, commissions and maintains critical facilities for the Metal & Minerals, Oil & Gas and Infrastructure industries.

Ship Lift and Marine Industries (SLAMI) FEED
Ship Lift and Marine Industr...Learn More

Ship Lift and Marine Industries (SLAMI) FEED

Learn More

Northern Territory Government & Paspaley Group

Darwin, Northern Territory, Australia

BAM Clough

The BAM Clough joint venture’s scope includes technical support and constructability input during Front-End Engineering Design works for the Ship Lift and Marine Industries Project in Darwin, Northern Territory.​

The Ship Lift and Marine Industries project represents an AU$100 million investment by the Northern Territory Government into major projects that will boost the local economy. The proposed project will include a ship lift facility for lifting vessels from the water for dry docking and maintenance works, and a common user area, being a hardstand area, available for ship repair and maintenance works.

The project will have the capacity to lift vessels more than 90 meters in length, including the Australian Defence Forces’ new offshore patrol vessel fleet.​

Saldahna Bay LPG Import Terminal
Saldahna Bay LPG Import Term...Learn More

Saldahna Bay LPG Import Terminal

Learn More

Sunrise Energy

Saldanha, South Africa

CMR Marine

The facility uses a floating multi-buoy morring system (MBM) where vessels of size 300GT – 20000GT may be received. A flexible hose connects the offloading vessel to a subsea PLEM (Pipeline End Manifold) which via an undersea pipeline of approximately 3.2 kilometres and an overland pipeline of approximately 2.1 kilometres, transports the LPG to the bullets at the storage terminal.

The near shore marine construction of the facility took 14 months to complete. Clough Murray & Roberts’ scope was completed very sucessfully, delivering the project on budget and on time. Utilising world leading engineering, construction management and project managmeent tools and resources the project was delivered to specification and is considered of world world class quality standard.

Through the implementation of our propriety Major Accident Prevention (MAP) HSE system, we were able to fulfil our goal of Zero Harm with no lost time injuries (LTIs) over duration of the project.

Fortescue Metals Group

Port Hedland, Western Australia, Australia

BAM Clough

The BAM Clough Joint Venture (BAM Clough) was awarded a design and construction contract for a fifth iron ore loading berth at Anderson Point Facility (AP5) in Port Hedland, Western Australia.

The works include the design and construction of a 306 metre long wharf extension, seven berthing dolphins, and the supply and installation of wharf  conveyor modules.

JKC Australia LNG (JGC Corporation, KBR and Chiyoda Corporation JV)

Darwin, Northern Territory, Australia

BAM Clough Joint Venture was awarded the contract to design and construct the Ichthys LNG Project Product Loading Jetty located at Blaydin Point, Darwin, Northern Territory. Gas from the Ichthys Field will be transported from the offshore CPF through a subsea pipeline more than 885 kilometres to the onshore LNG processing plant located at Blaydin Point.

The Product Loading Jetty Work includes typical piled with crossheads trestle with concrete superstructure, loading platform for LNG and LPG / condensate, the provision of seawater intake including pump casing and slope protection, waste water outfall structures, navigation aids, marine operations, corrosion and cathodic protection systems.

Bechtel

Onslow, Western Australia, Australia

BAM Clough

BAM Clough was awarded the contract by Bechtel to design and construct the Product Loading Facility (PLF) and Tug Berths associated with the Wheatstone Project LNG Plant near Onslow in Western Australia.

The scope consists of a 1.2 kilometre jetty with Marine Operations Platform, product loading platform incorporating a single LNG and Condensate load-out berth with associated breasting and mooring dolphin structures. Design, fabrication of topside piperack modules and platform modules with piping installation, insulation, module testing and ultimate completed piping modules installation and hook-up with final testing also forms part of the scope.

Anderson Point Facility (AP5)
Anderson Point Facility (AP5...Learn More

Anderson Point Facility (AP5)

Learn More

Fortescue Metals Group

Port Hedland, Western Australia, Australia

BAM Clough

The BAM Clough Joint Venture (BAM Clough) was awarded a design and construction contract for a fifth iron ore loading berth at Anderson Point Facility (AP5) in Port Hedland, Western Australia.

The works include the design and construction of a 306 metre long wharf extension, seven berthing dolphins, and the supply and installation of wharf  conveyor modules.

Ichthys LNG Product Loading Jetty
Ichthys LNG Product Loading ...Learn More

Ichthys LNG Product Loading Jetty

Learn More

JKC Australia LNG (JGC Corporation, KBR and Chiyoda Corporation JV)

Darwin, Northern Territory, Australia

BAM Clough Joint Venture was awarded the contract to design and construct the Ichthys LNG Project Product Loading Jetty located at Blaydin Point, Darwin, Northern Territory. Gas from the Ichthys Field will be transported from the offshore CPF through a subsea pipeline more than 885 kilometres to the onshore LNG processing plant located at Blaydin Point.

The Product Loading Jetty Work includes typical piled with crossheads trestle with concrete superstructure, loading platform for LNG and LPG / condensate, the provision of seawater intake including pump casing and slope protection, waste water outfall structures, navigation aids, marine operations, corrosion and cathodic protection systems.

Wheatstone Project Jetty
Wheatstone Project JettyLearn More

Wheatstone Project Jetty

Learn More

Bechtel

Onslow, Western Australia, Australia

BAM Clough

BAM Clough was awarded the contract by Bechtel to design and construct the Product Loading Facility (PLF) and Tug Berths associated with the Wheatstone Project LNG Plant near Onslow in Western Australia.

The scope consists of a 1.2 kilometre jetty with Marine Operations Platform, product loading platform incorporating a single LNG and Condensate load-out berth with associated breasting and mooring dolphin structures. Design, fabrication of topside piperack modules and platform modules with piping installation, insulation, module testing and ultimate completed piping modules installation and hook-up with final testing also forms part of the scope.

Chiyoda JGC JV

Papua New Guinea, Papua New Guinea

BAM Clough

Chiyoda JGC Joint Venture (CJJV) awarded the contract to design and construct the LNG and condensate offloading jetty for the PNG LNG project to the BAM Clough Joint Venture. The LNG and condensate jetty was constructed adjacent to the planned LNG facility twenty kilometres northwest of Port Moresby on the coast of the Gulf of Papua.

The scope included the design and construction of a 2.4 kilometre long trestle with substation platform, loading platform and single LNG loadout berth.

Woodside Energy Limited

Karratha, Western Australia, Australia

BAM Clough Joint Venture

BAM Clough Joint Venture was awarded the contract to construct a new LNG Jetty as part of the Pluto LNG Project for Woodside on the Burrup Peninsula near Dampier in Western Australia.

Design and construction of a 300 metre long approach LNG jetty including a 40 x 50 metre platform, four breasting dolphins, six mooring dolphins and navigational aids.

Woodside Energy Limited

Dampier, Western Australia, Australia

Harbourworks Clough Joint Venture (now BAM Clough Joint Venture)

The Harbourworks Clough Joint Venture (HCJV, now BAM Clough) completed a substantial contract to undertake construction of a 150 metre long jetty extension to Woodside Energy’s existing LNG export marine terminal, at Withnell Bay near Dampier, in Western Australia. The project provided an additional berth loading facility for LNG export tankers with a capacity up to 145,000 cubic metres, as part of Woodside Energy’s LNG Train V Expansion Project.

PNG LNG Project Marine Jetty
PNG LNG Project Marine JettyLearn More

PNG LNG Project Marine Jetty

Learn More

Chiyoda JGC JV

Papua New Guinea, Papua New Guinea

BAM Clough

Chiyoda JGC Joint Venture (CJJV) awarded the contract to design and construct the LNG and condensate offloading jetty for the PNG LNG project to the BAM Clough Joint Venture. The LNG and condensate jetty was constructed adjacent to the planned LNG facility twenty kilometres northwest of Port Moresby on the coast of the Gulf of Papua.

The scope included the design and construction of a 2.4 kilometre long trestle with substation platform, loading platform and single LNG loadout berth.

Pluto LNG Jetty
Pluto LNG JettyLearn More

Pluto LNG Jetty

Learn More

Woodside Energy Limited

Karratha, Western Australia, Australia

BAM Clough Joint Venture

BAM Clough Joint Venture was awarded the contract to construct a new LNG Jetty as part of the Pluto LNG Project for Woodside on the Burrup Peninsula near Dampier in Western Australia.

Design and construction of a 300 metre long approach LNG jetty including a 40 x 50 metre platform, four breasting dolphins, six mooring dolphins and navigational aids.

Woodside LNG Jetty – Train V Expansion
Woodside LNG Jetty – T...Learn More

Woodside LNG Jetty – Train V Expansion

Learn More

Woodside Energy Limited

Dampier, Western Australia, Australia

Harbourworks Clough Joint Venture (now BAM Clough Joint Venture)

The Harbourworks Clough Joint Venture (HCJV, now BAM Clough) completed a substantial contract to undertake construction of a 150 metre long jetty extension to Woodside Energy’s existing LNG export marine terminal, at Withnell Bay near Dampier, in Western Australia. The project provided an additional berth loading facility for LNG export tankers with a capacity up to 145,000 cubic metres, as part of Woodside Energy’s LNG Train V Expansion Project.